On August 7, 2015

Untreated sewage released in East Creek in Rutland

Potential health hazard exist for residents downstream

RUTLAND – The Vermont Department of Environmental Conservation (DEC) was notified today, Aug. 7, of a release of untreated sewage into East Creek in the City of Rutland.

A problem was first identified around noon on Aug. 6 when a routine inspection turned up a suspicious plume of light colored material entering East Creek from the creek bottom in the area of the West Street Bridge. The Agency of Natural Resources was notified. Dye testing showed that the leak was coming from an abandoned sewer pipe. The pipe was found to be receiving wastewater through a connection that was sealed in 1970. The seal had apparently failed, slowly filling the pipe with sewage, and eventually leaking into the creek.

DEC staff and city officials are presently on-site investigating the incident and repair activities have been initiated, according to the release received just after 3 p.m. Friday, Aug. 7.

Up to an estimated 150,000 gallons of sewage was discharged to the East Creek, which empties into Otter Creek approximately one half mile downstream, environmental officials estimate.

The Vermont Department of Health has been notified of the release, and in consultation with DEC, has determined that the potential for a health hazard exists.

People should stay out of the water and not swim in it, or use it for recreational purposes from Rutland to Proctor for 48 hours after the sewage release has been stopped.

Health Officers for Rutland City, Rutland Town, and the Town of Proctor have been notified, and the stretches of river from the point of release downstream to Proctor Dam will be posted with signage warning the public to avoid contact.

The plan is as follows:

1. DPW staff have installed sandbags in the manhole structure to direct the wastewater away from the leaking pipe;
2. On Monday (weather permitting) the department will temporarily bypass and clean out the manhole structure. The leaking connection will be properly sealed.
3. The DPW Engineering Division will develop plans for the replacement or refurbishment of the manhole structure, which will be undertaken as soon as possible.

It is not known how long the pipe has been leaking but the area is inspected frequently due to critical wastewater infrastructure in the area and concern for failures such as this. The exact volume of sewage that entered East Creek is also unknown.

People should avoid contact with the water in this area until the repair is completed and the notices removed.

Do you want to submit feedback to the editor?

Send Us An Email!

Related Posts

Dream Maker Bakers will close Dec. 22

December 11, 2024
By Polly Mikula Megan Wagner, owner of Dream Maker Bakers, announced Saturday Dec. 7, that she will be closing her bakery in Killington.  “With a mix of emotions, I’m announcing that Dream Maker Bakers will be permanently closing on December 22, 2024,” she posted on Facebook. “This is something that I have known I wanted…

Long-time Killington clerk is retiring

December 11, 2024
By Curt Peterson No one will ever call Lucrecia Wonsor a “nine-to-fiver.” The veteran Killington clerk (20 years, 4 months) and treasurer (11 years, 10 months) is known for her dedication to her responsibilities, working long hours and some weekends to successfully manage the official and financial affairs of this resort town of about 1,500…

Meet John Neal: Master of a versatile, enjoyable career

December 11, 2024
By Karen D. Lorentz When someone has worked their entire adult life in as many different ski-industry positions as John Neal, it’s not too surprising to hear him say, “The people and the passion for the sport and lifestyle have given me the opportunity to have a career I enjoy.”  Neal grew up in Ludlow,…

Parents complaints about gender curriculum in kindergarten spark concerns from local advocacy groups about censorship

December 11, 2024
By John Flowers/Addison Independent and Mountain Times staff The leadership of the Rutland Area NAACP raised concern over recent developments in neighboring Addison County related to the actions of two Mary Hogan Elementary School parents/guardians who have challenged gender-related instructional materials to educate kindergarten students at the Middlebury school. According to sources, the complaints relate…