On August 11, 2021

VNRC begins Dunklee Pond Dam removal in Rutland

RUTLAND — Removal of the Dunklee Pond Dam on Tenney Brook in the City of Rutland is now underway following a three-year design and permitting process, according to a news release from the Vermont Natural Resources Council (VNRC), Aug. 6.

The dam is classified as a “Significant Hazard Potential Dam,” meaning there is potential for loss of life and “appreciable” economic loss should it fail. Most recently, it has posed a substantial flood risk to nearby homes.

VNRC, in conjunction with Vermont River Conservancy (VRC), has been leading this project since dam owners Michelle and Snehal Shah requested assistance to remove it.

Dam removal will restore the river’s equilibrium, improve water quality and habitat, reduce the risk of a large sediment release to downstream river systems (East Creek, Otter Creek, and ultimately Lake Champlain), and reduce flood and erosion risks to downstream homes.

For almost 300 years, the Dunklee Pond Dam has blocked aquatic organism passage of fish and amphibians.

Removal will reconnect the trout populations upstream and downstream of the dam and restore a wildlife habitat corridor.

Dunklee Pond Dam has a rich history of industry and recreation. It was initially constructed in 1792 to operate a small linseed oil mill, followed by a pencil mill, a lumber mill and tannery, in the 1800s, and then a commercial ice harvesting pond. The dam was then utilized as a swimming and recreation area for Rutland City residents, including for ice hockey by Rutland High School.

Beginning in 2017, City of Rutland officials observed that the dam was exhibiting structural deterioration, with water leakage, causing multiple evacuations of nearby homes due to flood risk. Subsequently it was partially breached on Oct. 29, 2019, before the Halloween flood event in an effort to protect the public and temporarily mitigate dam failure concerns. A rapid inspection following the breach by SLR Engineers of Waterbury indicated that “the dam was now stable but all remaining elements were in poor condition, the spillway had working elements, cracks, missing chunks of concrete and dislodged stones. The retaining walls contained large voids and nearby sink holes were present.”

“There are more than 800 small dams in Vermont that no longer serve a useful purpose,” said Karina Dailey, restoration ecologist at VNRC. “They degrade water quality and aquatic habitat, restrict the movement of fish and other wildlife, and pose a risk to public safety. VNRC is very interested in helping dam owners who want to remove unwanted structures, which can have lasting benefits for entire communities and ecosystems.”

In place of the dam impoundment, a new floodplain and stream channel will be established, where trees and shrubs will be planted. The restored wetland may be planted in the future with some seedlings of Northern White Cedar Swamp from the area above to extend that native vegetation into the recovered area.

The Dunklee Pond Dam project entails removing a 75-foot long and 10-foot high concrete impoundment and approximately 11,300 cubic yards of sediment—followed by 900-foot of channel restoration and 1.9 acres of restored floodplain and wetlands to restore hydrologic connectivity to Tenney Brook.

A downstream fish passage weir at Rotary Park is also planned to address the perched concrete box culvert under Route 7, which is immediately downstream of the dam.

VNRC is leading this project with support from its partners, Vermont River Conservancy, U.S. Fish and Wildlife Service, the Lake Champlain Basin Program, and the VTDEC Ecosystem Restoration Program.

Funding for design, permitting, and construction is being provided by the New England Interstate Water Pollution Control Commission (NEIWPCC) in partnership with the Lake Champlain Basin Program, U.S. Fish and Wildlife Service, the National Fish Passage Program, and

Submitted
The Dunklee Pond Dam seen after it was breached. The dam will soon be removed by VNRC.

Vermont Department of Environmental Conservation – Clean Water Initiative Program. SLR Engineers of Waterbury and Kings Trucking and Excavating of Cambridge are the principal contractors for the project.

For more information about the work VNRC and partner organizations are doing to remove unused and unmaintained dams across Vermont, visit freevermontrivers.org.

Do you want to submit feedback to the editor?

Send Us An Email!

Related Posts

Miss Vermont Little Sisters program opens

September 4, 2024
Children 3-12 are invited to join mentoring program The Miss Vermont Scholarship Organization (MVSO) announced Sept. 2 the opening of registration for its mentoring program. The Little Miss Red Clover program pairs girls age 3-12 with local and state titleholders. Boys in the same age range are eligible to participate as Little Brothers. This program…

Vermont health insurance costs are among the highest in the nation — and rising quickly

September 4, 2024
By Peter D’Auria and Erin Petenko/VTDigger Health insurance prices in Vermont are high — and getting higher. Average premium prices for individual marketplace plans in Vermont are among the highest in the country, according to data from the Centers for Medicare and Medicaid Services, costing more than double the national average, even when federal subsidies are accounted for.  Vermont’s premium…

Interim regulatory exemptions in place to allow more affordable housing until 2027

August 28, 2024
The Dept. of Housing and Community Development and the Natural Resources Board announced Aug. 22 the release of the Act 250 Interim Exemption Map to help developers and investors create and improve housing that is more affordable. The new interactive map is an exceptional planning tool and shows potential areas where housing may be built without triggering Act 250 review.…

State gets $3 million for public safety and rehabilitation initiatives

August 28, 2024
U.S. Senator Peter Welch (D-Vermont), a member of the Senate Judiciary Committee, celebrated major investments by the U.S. Department of Justice’s (DOJ) Office of Justice Programs to support public safety and rehabilitation community projects in Vermont, totaling over $3.1 million, Aug. 22.  The announcements include funding from the Department of Justice’s Edward Byrne Memorial Justice…