On March 7, 2015

Firefighters battle major fire at Innsbrook Townhouses

UPDATE: Two wings (section C and D) were destroyed by the fire that broke out at the Innsbrook Townhouses late Saturday night. All occupants escaped safely, firefighters reported.

The 16-condo complex had four wings, A, B, C and D. The latter two were burned to the ground. The condition of the other wings remains unclear.

The fire took about six hours to extinguish. Among other factors the sub-zero temperatures and low water pressure made the fire more difficult to put out, firefighters reported from Killington and Rutland.

Onlookers reported seeing the fire’s blaze rise multiple stories high into the air.

About 600 families rent timeshares at the Killington Townhouse condos, stated Paul Kaufman, president of the Killington Townhouses, adding that the future of the complex is undetermined at this point in time.

 

Staff report

KILLINGTON— Early morning Saturday, March 7, firefighters were called to the scene of a major fire at 48 Innsbruck Lane, where 16 townhouses are located. (Roughly behind Peppino’s Restaurant and Mountain Sports Inn on the lower portion of Killington Road.) Witnesses say they first noticed the fire at about 12:30 a.m. and soon thereafter the glow from the fire could be seen from quite a distance indicating that it spread fairly quickly.

Firefighters from Killington and Rutland reportedly were already on the scene but both ladder trucks had problems getting water to flow.

Sources say residence were evacuated safely, but so far that has not been confirmed.

If you have additional information, please post here and help us  keep our community informed. We will post updates as we receive them.

Do you want to submit feedback to the editor?

Send Us An Email!

Related Posts

Three new homes at the Vistas at Sunrise break ground

October 2, 2024
The Vistas at Sunrise recently broke ground on the final phase of the Vistas including three four-bedroom, 4,000 square foot homes in Sunrise Village in Killington. These homes will complete the subdivision, marking a significant milestone for the community.  The first house of this final phase of construction is expected to be complete during next…

Vt Agency of Education releases 2023-24 statewide assessment results, gaps remain

October 2, 2024
The Vermont Agency of Education released the preliminary 2023-24 Vermont Comprehensive Assessment Program (CEAP) results on Friday, Sept. 27. The assessment is administered annually in the spring to students in grades 3-9, and 11. The assessment measures students’ mastery of the Common Core State Standards in English language arts (ELA), mathematics, and the Next Generation…

Killington’s donated snow cat enhances Vermont Tech students opportunities 

October 2, 2024
By Brooke Geery, Killington Resort At the end of last season, Killington Resort donated one of its well-used snow cats to Vermont Technical College (VTC) in Randolph. The gift was the idea of Vehicle Maintenance Manager Halley Riley-Elliot, who graduated from the VTC program herself in 2021. As the equipment had fulfilled its usefulness for…

Bridgewater declines assistance

October 2, 2024
By Brett Yates Regional planners want to help a trio of Windsor County municipalities win federal funds for projects that would prevent flood damage during future storms. But, so far, the town of Bridgewater isn’t interested. A new program called the Resilience Initiative for Vermont Empowerment and Recovery (RIVER) aims to protect communities that sit…