After a week of paving, the base of Killington Road reopened Tuesday with new blacktop from the intersection with Route 4 to Anthony Way. An 8-foot sidewalk on the west side was also paved.
![](https://mountaintimes.info/wp-content/uploads/2024/08/killington-road-paving-by-Pat-Wise-8.27.2024-IMG_9776-768x1024.jpg)
![](https://mountaintimes.info/wp-content/uploads/2024/08/killington-road-paving-by-Pat-Wise-8.27.2024-IMG_9780-1024x768.jpg)
![](https://mountaintimes.info/wp-content/uploads/2024/08/killington-road-paving-by-Pat-Wise-8.27.2024-IMG_9778-1024x768.jpg)
![](https://mountaintimes.info/wp-content/uploads/2024/08/killington-road-paving-by-Pat-Wise-8.27.2024-IMG_9777-768x1024.jpg)
After a week of paving, the base of Killington Road reopened Tuesday with new blacktop from the intersection with Route 4 to Anthony Way. An 8-foot sidewalk on the west side was also paved.