On October 2, 2015

State watershed cleanup plan in place for Connecticut River

By Stephen Seitz

The state Department of Environmental Conservation (DEC) has adopted a new plan to improve water quality and aquatic habitat in a number of central Vermont watersheds, as well as tributaries emptying into the Connecticut River.

The area is known as Basin 14, and it covers central Vermont through Orange, Caledonia, Washington, and Windsor Counties. Basin 14 includes the Stevens, Wells, Waits, and Ompompanoosuc river watersheds, as well as the tributaries.

Kevin Geiger, a senior planner for the Two Rivers Ottauquechee Regional Commission, said the goal was to identify and remedy water quality problems. Many of the problems are related to roads, he said.

“A lot of that has to do with improving culverts,” Geiger said. “Not only does it help roads, it provides better fish passage through the culverts.”

According to the plan, the chief problems for water quality in this area include “encroachments, channel erosion, invasive species, land erosion, pathogens, toxins, nutrient loading, thermal stress, acidity, and flow alteration.”

The plan calls for monitoring the water for excessive nitrogen or phosphorus, assessing the role of agriculture, taking an inventory of road erosion and the capital budgets for all the towns in the basin, and holding workshops on water quality practices.

Because so many agencies are involved in the plan, Geiger said, there isn’t any central funding to accomplish the goals.

While the plan calls for monitoring nitrogen and phosphorus (called “nutrient loading” in bureaucratic jargon), Geiger said it’s not this area’s biggest problem. In the Lake Champlain area, phosphorus runoff from farms is causing a great number of the lake’s problems.

“We don’t have that kind of concern,” he said. “It’s not a major issue.”

The plan, he said, is required by law. The Agency of Natural Resources collaborated with state and federal agencies, regional planning commissions, watershed organizations, and concerned citizens to develop the plan.  “Each plan expires every five years,” Geiger said, adding that the requirement was in place since the 1990s.

The plan for the Waits River watershed includes: planting vegetation buffers near streams to protect them from the consequences of land use; improving fish habitat; taking care of the superfund site at the Pike Hill mine; and improving the flow at the Bradford Dam, among other things.

The plan outlines similar measures for the tributaries, including buffer inventory on the Vermont side of the Connecticut River corridor and expanding the Roy Mountain Wildlife Management Area to include the wetlands and ecosystems around Symes Pond.

“Nine high-priority river corridor project reaches have been identified,” according to the plan. “Two high-priority culverts have been targeted for replacement/removal/retrofit” due to being out of compliance with existing codes. Geiger said that the Clean Water Act originally required that all U.S. waters should have been in full compliance by 1983.

“We’re still working on that,” he said. “Vermont has some top quality waters, and we’ve got to keep them relatively pristine.”

Do you want to submit feedback to the editor?

Send Us An Email!

Related Posts

Most tasks in Vermont hazard mitigation plan left incomplete, auditor says

September 18, 2024
By Peter D’Auria/VTDigger In 2018, the state of Vermont released a plan outlining how it should prepare for natural disasters. The State Hazard Mitigation Plan lays out 24 strategies, separated into 96 discrete actions, to address risk factors for natural disasters. Those actions included improving flood resilience, strengthening building design standards and educating local communities about potential hazards,…

Worldly baker teaches bagel making

September 18, 2024
By Curt Peterson A dozen Hartlanders joined “master baker” Jeffrey Hamelman at the public pizza oven on Saturday morning, Sept. 7, bent on learning how to make bagels. Ten women, one rising 8-year-old girl, and an aging male journalist brought a short list of kitchen equipment. One of the women, Sara Fuschetto, is a breadmaker…

Attempting to avoid dogs, Ram hits man

September 18, 2024
On Wednesday, Sept. 11 at 5:45 a.m., police responded to a vehicle vs. pedestrian crash on Lake Dunmore Road near Fernville Road in the town of Leicester.  Investigation revealed Timothy Lester, 54 of Leicester, was walking on the side of the northbound lane while Benjamin Kandzior, 43 of Leicester, was traveling south in a Dodge Ram…

Daniel Banyai arrested for violating conditions of release on pending aggravated assault charge

September 18, 2024
Banyai was arrested by the same Pawlet constable he’s charged with assaulting By Ethan Weinstein/VTDigger Daniel Banyai, 51, was arrested Monday, Sept. 9, for violating conditions of release on his pending felony charge of aggravated assault against a police officer, according to a press release by Pawlet Constable Thomas Covino. Covino is the same officer whom Banyai is…